Supported Assets

Solar PV Integration

Cleori enables solar photovoltaic systems to participate in the Estonian mFRR (manual Frequency Restoration Reserve) market operated by Elering. Our platform provides seamless integration for commercial and utility-scale solar systems, unlocking new revenue streams through grid flexibility services.

Why Solar Flexibility?

Solar PV systems are ideal for flexibility markets due to their:

  • Down-regulation capability - Reduce output during grid oversupply
  • Fast response times - Activation within minutes
  • Revenue generation - Compensation for flexibility services
  • Grid support - Help balance renewable energy on the grid

Integration Requirements

Minimum Specifications

  • Capacity: 100 kW minimum installed
  • Inverter: Remote control capability
  • Response: < 15 minutes activation
  • Granularity: 5% power steps

Supported Technologies

  • String inverters with curtailment
  • Central inverters
  • Power optimizers with control
  • Smart inverters (grid-following)
  • All major inverter brands

Telemetry Requirements

Important: Telemetry must be sent at least every 10 seconds to meet Estonian mFRR market requirements.

ParameterFieldUnitDescriptionRequired
TimetimeRFC 3339Timestamp of measurement
PowerpowerkWCurrent generation (always positive)

Flexible Submission: Telemetry values can be sent all together in a single request or individually as they become available. The API accepts partial updates - you only need to include the time field and at least one measurement value.

Integration via Cleori API

Currently, integration is supported exclusively through the Cleori API. Partners must implement the required endpoints for telemetry submission and curtailment activation reception.

Sending Telemetry

Receiving and Confirming Activations

Time-Critical: Activation signals must be acknowledged promptly to maintain grid stability during overproduction events.

Polling Requirement: Activations must be checked at least once per minute to ensure timely response to grid requirements.

Getting Activations

Poll for pending down-regulation requests:

Confirming Activation

Once you've started reducing generation, confirm it:

Getting Started

  1. Step 1: System Assessment
    Verify inverter control capability and communication protocols
  2. Step 2: API Integration
    Implement telemetry submission and activation polling
  3. Step 3: Testing
    Test down-regulation response with simulated activations
  4. Step 4: Market Validation
    Validate compliance with Estonian mFRR requirements
  5. Step 5: Revenue Generation
    Start earning from grid flexibility services

Ready to monetize your solar flexibility? Our team will guide you through the integration process.

Next Steps